Abstract
Economic load dispatch (ELD) is the process of allocating the required load between the available generation units such that the cost of operation is minimized. The ELD problem is formulated as a nonlinear constrained optimization problem with both equality and inequality constraints. The dual-objective combined economic emission dispatch (CEED) problem is considering the environmental impacts that accumulated from emission of gaseous pollutants of fossil-fueled power plants. In this paper, an implementation of mine blast algorithm (MBA) to solve ELD and CEED problems in power systems is discussed. Results obtained by the proposed MBA are compared with other optimization algorithms for various power systems. The results introduced in this paper show that the proposed MBA outlasts other techniques in terms of total cost and computational time.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.