Abstract
The thriving of high-voltage direct current transmission for hydropower tackles supply-demand imbalances but complicates grids safety, especially concerning the related challenges of varying numbers of hydroelectric units operating, including the effects of discrete rectifier station altering current and vibration zones with minimum numbers of hydroelectric units operating. Here, a mixed integer linear programming model considering high-voltage direct current safety constraints for daily peak-shaving of cascade hydropower plants serving multi-grids is proposed to address these challenges. First, the model integrates the altering current constraint across multiple intervals to ensure stable operation following the passive transition of the direct current terminal into islanded system state. Second, a power distribution strategy considering load differences is adopted to compensate for shortcomings of traditional peak shaving treatments for multiple grids to achieve effective results. Finally, a method for linearizing the segmented vibration zones of hydropower station with minimum numbers of units operating is adopted during model solving to ensure that the model meets safe specifications. The case study indicates that besides guaranteeing the proposed security constraints, the model reduces the average distance by 30.4 % and 30.3 % during the dry and flood seasons, respectively, with better calculation time and variance of the residual load.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.