Abstract

AbstractShort-term hydropower generation with several water reservoirs requires deciding, for each moment in time, the volume of water (outflow) that is released from every reservoir to be turbined and generate energy. Knowing the price of energy at every time period, the objective is to maximize the income earned from the generated energy. In this paper, we present (1) a Hydropower Reservoirs Operation Optimization problem with a higher level of detail than those found in the literature, encompassing temporal delays, water hammer effects, and increased temporal discretization, among others features, and (2) two distinct approaches for addressing this problem: MILP and PSO. These methods are compared across instances of varying nature to evaluate their performance. We make our code available on GitHub: https://github.com/baobabsoluciones/flowing-basin.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.