Abstract

This article describes the developing process of China’s pathogenic microorganism laboratory construction through a fair summary of the key points events involving the issues of Microbiology Laboratory Biosafety Management Regulations , Level Biosafety Laboratory System Construction and High Level Biosafety Laboratory System Construction Plan (2016-2025) , the research development of Domestic Mobile Biological Safety Level-3 Lab, the establishment operation of Wuhan National Biosafety Laboratory the release of other key technology equipment development. Key words: High Level Pathogenic Microorganism Laboratory; Biosafety Laboratory; Developing process

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.