Abstract
This paper studies the precast and cantilever erection process of pre-stressed concrete continuous beam bridge alignment control in short line method, basis on the construction of a light rail. Various stages of bridge construction performed on simulation analysis and calculated by the finite element software MIDAS, concluded the ultimate internal force and deformation values, and the maximum deformation are within the scope of design elevation deviation 20 mm allowed, as to achieve the target of bridge assembly.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.