Abstract

Microtunneling is a trenchless technology method used for installing new pipelines. The inherent advantages of this method over open-cut trenching have led to its increasing use. This paper presents a general model for microtunneling decision support system (MDS) that can be used as a basis for developing more effective microtunneling design and construction. The model objectives are to: (1) develop a description of local geology that reflects the uncertainty of the information on which it is based and (2) provide the input data necessary for other decision support systems. MDS is composed of two main modules: (1) geology prediction model (GPM) module which is based on Neural-Autoregressive Hidden Markov Model and (2) excavation method selection module to select appropriate excavation method based on GPM result. In order to validate the proposed model, a microtunneling project: Zhong-he drainage water tunnel in Taiwan, was used as a case study. The result shows that the MDS model achieves these objectives to a satisfactory degrese.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.