Abstract
Modern distribution networks' scheduling faces many more challenges than traditional networks. Because on the one hand, it must satisfy the technical and security constraints of the distribution system, and on the other hand, it must observe the optimal scheduling of microgrids. Hence, in this paper, a bi-level mixed-integer linear programming (MILP) model is presented in which the scheduling of the distribution network is done by considering the optimal scheduling of microgrids and smart homes. In the first level, each microgrid performs its optimal scheduling in a decentralized manner and delivers it to the distribution system operator (DSO). Then, in the second level, DSO plans the main grid according to the optimal schedule of microgrids and by implementing distribution feeder reconfiguration (DFR). Finally, the problem is solved in the form of four case studies by the CPLEX solver in GAMS software and the results show that the proposed model not only reduces the total operating cost by 27.05% but also significantly increases the consumers’ comfort index. The results also illustrate that DFR implementation and participation in the DR program reduce total operating costs by 19.11% and 14.02%, respectively.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Electrical Power & Energy Systems
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.