Abstract

this paper evaluates combination of DE algorithm and benders decomposition theorem of VMG is used to solving the large scale mixed integer programming problems. DE algorithm is implemented in Village area Micro grids. Village area micro grid and the required load is calculated regarding the sold out power or purchase power with the help of DE algorithm. Differential evolution algorithm is applied in the village area micro grid and measure the real power, reactive power of various power plants. . In this DE algorithm is implemented in village area micro grid and the survey period is two years. Final survey shows which month produce more power and sold out power in nearest city area electricity board, But in power shortage in village area micro grid ,it purchase the power from nearest electricity board.DE algorithm determine the one month power survey and benders decomposition determine the individual value of the power plants. But the benders decomposition theorem is not accept the non linearity items. To overcome this problem BDCT and DEA is implemented in village area micro grid. This combination is used to maintain the drop out voltage of any power plants.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.