Abstract

AbstractThe capital of Qatar, Doha is being increasingly turned into a modern centre for industry, trade and sport. One essential precondition for this is the development of high‐capacity infrastructure with modern means of transport. This includes the construction of an underground railway network, which has to be completed in a very short time due to the football World Cup taking place in Qatar in 2022. The (part) project ”Metro Green Line Underground“ was awarded in summer 2013 to a Joint Venture comprised of Porr (lead), the Saudi Binladin Group and the local construction company HBK. It includes the turnkey completion of the underground part of the Green Line in the future underground system. This includes two tunnels with a length of 17 km each, six stations, crossover structures, several emergency exits and 32 cross passages and two road underpasses. The shield drive for the running tunnels began in late summer 2014 and could be completed after only 18 months of construction time in early 2016. In addition to explaining how the simultaneous operation of six EPB machines was successfully mastered, this article also describes the conventional tunnelling of the various connection and underpass structures under inner‐city conditions.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.