Abstract
There are a plethora of challenges faced due to the usage of conventional energy sources. Our objective is to optimize the performance and working of an existing on-grid solar power plant by focusing on common problems found in such large-scale installations. The suggested proposals for improvements were based on three identified areas: power generation and performance ratio (PR), running costs, and maintenance costs. We have used PVsyst, a software package, for simulating and analysing the working of the power plant. SCADA data was obtained from the plant along with generated sets of data from PVsyst and was further used to develop our proposals for improvement. Four improvements were suggested, which are “method to improve PV panel cleaning efficiency for dry tropical regions”, “Simulink-based estimation of partial shading loss reduction using herbicides for vegetation management”, “procedure to suggest new optimum tilt for a seasonal tilt arrangement”, and “automated switching and lighting circuit using two-way relay switch”.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.