Abstract

When implementing housing construction programs, it is necessary to have a single methodological justification for explaining the choice of a specific land plot for withdrawal for urban needs. The author's method of determining the size of the land plot, which is planned to withdraw for the implementation of the city programs, is proposed. Two situations in which it is expedient to use this procedure are considered. The first is when the city needs to determine the maximum size of the free area, which should be negotiated with the owner, based on a set of factors. The second is when the city can carry out the seizure of land for the implementation of urban programs with due regard for the commercial interests of the owner. The use of the proposed mathematical apparatus of the procedure is illustrated by specific examples.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.