Abstract

After an introduction to the Japanese organization for safety regulations administration for commercial nuclear power plants, a review is made of historical changes in capacity factor, share percentage of electricity generated by nuclear power plants, and annual incidence of accident, trouble and deficiency. Next, the administrative organization for repair and replacement decisions for flawed structural components in plant is described. Finally the paper discusses two examples of research work carried out for the elucidation of the cause and mechanism of structural failures of splitter plates in PWRs and of bearing rings of hydrostatic bearing in a BWR.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.