Abstract

ABSTRACT While implementing a construction project, production-rate assessment needs to be conducted throughout the different stages of the project because this assessment can determine the success or failure of the project. In South Korea, the construction-standard-production-rate (CSPR) is used for determining the production-rate of individual construction equipment. However, CSPR cannot provide the production-rate of activities considering a combination of more than two different types of equipment (eg, excavator and dump truck used for excavation-load-haul activities). Having ready-made data on such production-rates of different equipment combinations would be beneficial for determining and optimal fleet management plan. Furthermore, such data can be beneficial for implementing optimized scheduling methods using supervised-learning methods. Accordingly, simple discrete event simulation approaches were carried out for data generation and regression analysis for testing the feasibility of the usage of such data. The time inputs used in this study were calculated based on the equations and information given in the CSPR.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.