Abstract

Exact and complete preparation of a hydrographic survey project allows for the avoidance or reduction of additional costs and unexpected delays and, at the same time, increases the efficiency of the survey. One of the essential requirements at the survey planning stage is a calculation of time necessary for performing bathymetric measurements with a multi-beam echosounder. Based on these calculations, many decisions related to the costs and methodology are made. The article presents the method of time estimation for the hydrographic surveys and takes into account many variables that directly affect the final duration of the project. The paper demonstrates the influence of water depth, multi-beam echosounder swath angle, and other planning parameters related to the scheme of survey lines on the total time of stay at sea. The main findings are based on the author’s over twenty years of experience aboard the Polish Navy hydrographic ship Arctowski and include thorough analysis of specialist literature, publications, manuals, and international standards.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call