Abstract

Method of probabilistic modeling of the production cycle duration time within hard coal longwall faces has been described in the present study. Duration of these activities for various technologies, including probabilistic schemes modeling have been described in the introduction. In order to illustrate the described method, an example of probabilistic modeling for data obtained from specific longwall face has been presented. The final chapters entitled “The possibility of Using the method” and “Results” contain information on the perspective of the method application in mining industry.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.