Abstract

Repairs of water supply, sewage and central heating installations in residential buildings should be carried out systematically. However, very often, renovation dates are postponed, which results in installation failures. The failures of water supply, sewage and central heating installations, due to the currently used methods of masking them and running them as under-plaster and under-floor installations, are always connected with the damage and necessity of reconstruction of the building elements. As a result, renovation work has to be carried out to a greater extent and the amount of construction waste is much greater. The analysis of different renovation strategies of water supply, sewage and central heating systems in residential buildings made in traditional technology has been carried out. The article presents the results of the research on the effects of the postponement of the renovation works on the changes in the technical condition of the building and on the scope of renovation works. The aim of the research is to develop a method for planning repairs of the installation taking into account optimization of the amount of construction waste. The aim of the research is also to answer the question: To what extent does the postponed repair of water and sewage installations influence the amount of construction waste? In the proposed method, the Prediction of Reliability according to Rayleigh Distribution (PRRD) model is used. The results of the research indicate the necessity of conducting the renovation works of the installation in a timely manner due to the increasing amount of construction waste and the introduced reduction of its amount with the increase of the recycling rate.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call