Abstract

[For the English abstract and full text of the article please see the attached PDF-File (English version follows Russian version)].ABSTRACT The authors solve the problem of determination of operational risks relating to elements of a railway track under increasing over time changes in the track geometry due to weakening or breakdown of clip-bolt intermediate fastenings. To evaluate fastenings’ failures a method is offered based on the use of a parameter of rails’ displacement under train load. The parameter can be obtained by using automated diagnostic devices type KVL-P, ADK-I and «ERA» and similar to them. The article provides calculation of rail head displacement value, depending on the number of defective fastenings. The conditions for method’ s application are stipulated. Keywords: railway, railway track, operational risks, failures of rail clip- bolt fastenings, evaluation method.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.