Abstract

Statistical analysis is used to examine the effect of the main raw-material and process factors on coke rate and productivity for the blast furnaces at the Chelyabinsk Metallurgical Combine during the period from 2007 to July 2012. A method is developed for calculating and predicting coke rate and daily pig-iron output in the blast-furnace shop, and a combination of parameters is found to reduce coke rate and increase the productivity of the shop. The factors table which is used throughout the industry is refined for the conditions that exist in the blast-furnace shop at the ChMK.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call