Abstract

The Piano Key Weir (PKW) is a particular geometry of weir associating to a labyrinth shape the use of overhangs to reduce the basis length. The PKW could thus be directly placed on a dam crest. Together with its important discharge capacity for low heads, this geometric feature makes the PKW an interesting solution for dam rehabilitation. However, its hydraulic design remains problematic, even at a preliminary stage.This paper presents a preliminary design method based on results of experimental tests. The method enables to design project models by extrapolation of characteristics of existing idealized scale models.A practical application is presented to illustrate the method.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.