Abstract

Hot rolling planning in steel and iron production process is analyzed and a prize-collecting vehicle routing problem model with uncertain rolling planning numbers for hot rolling planning is presented with balancing the workloads of downstream production lines as one objective. The model considers the jump limit of discharging temperature, finishing rolling temperature and coiling temperature of adjacent slabs, the rolling position of slab surface grade and mix rolling of multiple rolling type slabs, but also considers the reasonable arranging of warm-up materials and staple materials. A two-stage algorithm based on Variable Neighborhood Tabu Search is designed to solve the model. Computational experiments with industrial data show the effectiveness of the proposed model and algorithm.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.