Abstract
Delaying responsibility allocation is one of the important contents in the construction management of power grid infrastructure projects. Due to the large investment in power grid infrastructure projects, long construction period and complicated operation procedures, many delays occurred during the construction process. Based on this, combined with the theory of time difference theory, this paper proposes a delay analysis method that considers the logical relationship between engineering processes. Secondly, the route time difference theorem is proposed, and the calculation steps and rules of the delay analysis method considering the logical relationship between engineering processes are given. Finally, the substation main structure construction project is selected as an example analysis, and compared with other methods, which effectively proved that the validity and feasibility of the proposed delay analysis method. The method of delay responsibility allocation proposed in this paper also provides ideas and directions for the subsequent research on delay assignment of similar construction projects.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.