Abstract
The paper analyses possibilities to carry out methane drainage of a longwall in seam 510. A possibility to fight against the methane hazard was determined based on results of forecasting for methane emission to mine workings. A system of methane drainage was suggested for the adopted method of longwall face ventilation. The location of drainage roadway was determined for the selected methane drainage system. The paper includes a geomechanical analysis for a numerical model, which was aimed at determination of the optimum location of the drainage roadway in a seam overlying the longwall panel.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.