Abstract
The results are described of a case study of a gas extraction and utilization system located on a sanitary landfill site. The system includes the following: a 0.9-m-diameter gas extraction well, gas monitoring probes installed radially from the well, a continuously operating gas pump, waste gas outlet, and an onsite greenhouse heated by a modified forced air gas furnace. The recovery of landfill gas is both feasible and economical, even in an unprocessed state. The system operating characteristics for a 5-month period in the winter of 1979 are provided.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.