Abstract

In this paper, metaheuristic approaches for the two-machine flow-shop problem with a common due date and the weighted late work performance measure ( F 2 | d j = d | Y w ) are presented. The late work criterion estimates the quality of a solution with regard to the duration of the late parts of jobs, not taking into account the quantity of the delay for the fully late activities. Since the problem mentioned is known to be NP-hard, three trajectory methods, namely simulated annealing, tabu search and variable neighborhood search are proposed based on the special features of the case under consideration. Then, the results of computational experiments are reported, in which the metaheuristics were compared one to each other, as well to an exact approach and a list scheduling algorithm.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.