Abstract
Cavitation often occurs in high-velocity water flows. Cavitation-induced erosion is a major threat facing many engineering projects. For hydraulic and hydropower engineering projects, the major methods for alleviating and preventing cavitation erosion can be classified as follows. The first method is to optimize the geometric design of water passages to minimize intense water flow separation, which leads to the formation of negative pressure, the necessary condition for cavitation to occur.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.