Abstract
The Multi-Skill Resource-Constrained Project Scheduling Problem (MS-RCPSP) is an NP-Hard problem that involves scheduling activities while accounting for resource and technical constraints. This paper aims to present a novel hybrid algorithm called MEMINV, which combines the Memetic algorithm with the Inverse method to tackle the MS-RCPSP problem. The proposed algorithm utilizes the inverse method to identify local extremes and then relocates the population to explore new solution spaces for further evolution. The MEMINV algorithm is evaluated on the iMOPSE benchmark dataset, and the results demonstrate that it outperforms. The solution of the MS-RCPSP problem using the MEMINV algorithm is a schedule that can be used for intelligent production planning in various industrial production fields instead of manual planning.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.