Abstract

Most Australian surface and ground waters have relatively high concentration of bromide between 400 and 8000 μg/L and even higher concentration in seawater between 60,000–78,000 μg/L. Although bromide is not regulated, even at low concentrations of 50–100 μg/L, it can lead to the formation of several types of harmful disinfection by-products (DBPs) during the disinfection process. One of the major concerns with brominated DBPs is the formation of bromate (BrO3−), a serious carcinogen that is formed when water containing a high concentration of bromide is disinfected. As a result, bromate is highly regulated in Australian water standards with the maximum concentration of 20 μg/L in the drinking water. Since seawater reverse osmosis (SWRO) desalination plays an important role in augmenting fresh water supplies in Australia, SWRO plants in Australia usually adopt 2nd pass brackish water reverse osmosis (BWRO) for effective bromide removal, which is not only energy-intensive to operate but also has higher capital cost. In this study, we evaluated the feasibility of membrane capacitive deionisation (MCDI) as one of the alternatives to the 2nd pass BWRO for effective bromide removal in a more energy efficient way.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.