Abstract
The Southbank Interchange of the Melbourne City Link Project links major freeways and access roads. The permanent excavation covers an area of 3 ha and extends to a maximum depth of 9 m, which is 6 m below the ground water table. Design and construction approaches were developed to (i) control seepage into the excavation to limit groundwater lowering beyond the site, and (ii) limit the effects of potentially damaging base heave during construction. Lateral flow of groundwater into the excavation was controlled by a cut-off wall extending through the compressible clay with a surrounding line of closely spaced recharge wells. Analyses showed the recharge wells in combination with the wall would be effective in limiting drawdown outside the site. Monitoring showed that pore water pressures were maintained within the design criteria, with the assistance of deep recharge of an underlying aquifer to control vertical seepage. Survey showed settlements outside the site were minimal. Shallow pressure relief drains were installed to limit uplift pressures and control base instability in the deepest parts of the excavation. Monitoring of the groundwater levels in the underlying aquifer and comparisons with results from flow models were used to successfully control uplift pressures during construction.Key words: clay, settlement, groundwater, excavation, recharge, construction.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.