Abstract

The thesis adopts the SLP (System Layout Plan) to analyze the collected data of new PMS medical cable assembly product, manufacturing process and production material flow with the use of different tools, combined with constrained conditions related of the new facility to plan the process layout of the PMS medical cable assembly line, then adoptscorrelation analysismethods from production line balance theory and material flow project theory to improve layout of production line, so that the material transit distance could be shortened, the cost could be reduced and the balance rate of the production line could be improved. This thesis will be introduced by presenting the way of gathering solution for an example step by step.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.