Abstract

PurposeEmployee knowledge is an essential contributor to managing supply chain ambiguities and supply improvement. The current research examined green technology (GT) implementation and knowledge management (KM) processes toward knowledge worker supply performance (KWSP). The present study postulates that GT implementation's positive impacts on the KM process and KM process lead to improved KWSP based on employee knowledge contribution.Design/methodology/approachTo accomplish the research objective, the data were taken from those production houses that are utilizing GT. A total of 400 questionnaires were distributed in Zhengzhou city, and feedback was received (343). The feedback data were studied through partial least squares-structural equation modelling (PLS-SEM) and fuzzy set qualitative comparative analysis (fsQCA). fsQCA is used to analyze improving the multiple configurational paths of KWSP.FindingsThe study revealed that GT implementation is positively associated with the KM process, and KM processes substantially influence the improvement of KWSP. The consequence of fsQCA demonstrated that various combinations improve supply chain performance. The study combines certain dimensions of GT implementation with the KM process, revealing that supply chain performance improved based on knowledge sharing in manufacturing firms.Research limitations/implicationsThis study guides decision-makers and academics on using the knowledge process associated with GT to improve supply chain performance. Moreover, future researchers should use information technology in supply houses and compare the result with the literature to generalize the results better.Originality/valueThe asymmetric technique assists in differentiating the connections that are not directly investigated by the traditional symmetric method. The study covers and identifies various approaches that can be used in manufacturing firms to improve the supply chain process and employee satisfaction. The study combines the two techniques to understand supply performance based on knowledge sharing in manufacturing firms.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call