Abstract

Strengthening the impact of the production and economic mechanism on increasing the economic efficiency of the production process and the quality of work is possible on the basis of choosing the most effective ways to achieve high end results of the national economic system of the country. One of these ways is the inclusion in the system of controlled parameters of the economic parameters of quality cost management, the use of which guarantees the quality coordination system to reach a given economically justified state. Adjustment of quality costs consists in maintaining the established proportions between the costs of quality assurance (quality) and the mismatch of work quality indicators, which is achieved by controlling the level of defects, maintaining certain conditions, rules and norms corresponding to the optimal mode of work on quality assurance and the optimal value costs. The quality assurance process is based on a classification represented by a range of activities aimed at ensuring the quality of tools, objects of labour, living labour and information data at all stages of the production process. The costing methodology is based on the selection of the costing object and costing units. Representation of work on quality assurance as an object of calculation, and hours of work or total amount of work as calculation units allows at the right time to present in value terms both the quality assurance process as a whole and the cost of quality for the product. The recommended mechanism of the cost management system in general is focused on a wide range of enterprises and associations, and its use allows to obtain the effect of minimizing the cost of quality, as well as improve the quality of work to ensure product quality, ice directly contribute to production efficiency and quality. Increase of economic benefit at the expense of cost control system solutions of the problem in the future is possible if its implementation on the basis of the theory of functional management development, conversion of static model into a dynamic coordination costs.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.