Abstract

Modern investment and construction activities in the Russian Federation under the current paradigm of providing a comfortable environment for human activity should ensure the continuous creation (improvement) of the infrastructure of the territory. Every year, at the state level, investment programs are created that reflect the priority areas of construction and are financed from the state budget. However, the existing problems in the deterioration of the quality of construction products, not always a high level of qualification of performers and the necessary construction and investment control at all stages of the life cycle of a capital construction facility have led to the need to create a system that provides for the establishment of limits on budget commitments to cover existing risks and execute an investment project on time.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.