Abstract

Theoretical analysis, numerical simulation, and borehole drilling were used to study the mechanism of four large-scale water inrush events that occurred during the mining of the 1121 working face in the Hongliu coal mine in the Ningdong mine area. We concluded that the working face inrush was induced by water in the bed separations formed by overlying strata movement caused by the mining process. To control such inrushes, the location, size, and hydrogeological properties of the 18 m thick key aquiclude were investigated. We determined that the best time to drain the bed separation water was between when the beds separated and the roof caved, before water inrush occurred. The best place to drain water from was directly above the key aquiclude. These results should be useful for other sites with similar mine conditions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.