Abstract

Bolt-connected precast buildings are increasingly prevalent, especially due to their efficient force transfer and accelerated construction processes. However, in cold climates, special attention must be directed towards the effects of freeze-thaw (F-T) damage on concrete at bolt connection sites. This study conducted an accelerated F-t-test to investigate how concrete F-T damage influences the preload force of the connection bolts. The changes in bolt preload forces across F-T cycles were monitored using advanced fiber optic sensing technology. To mitigate preload force loss, silicone rubber sleeves were introduced into the bolts. Results indicate a correlation between initial preload force and subsequent preload loss, with lower initial preloads leading to greater losses. Additionally, the concrete's frost resistance significantly affects preload force loss, with less resistant specimens showing marked preload decreases. A notable risk of brittle damage arises after 3 to 6 F-T cycles if a 4 mm gap between the bolt and concrete exists, attributed to water freezing and expansion within the gap. Concrete specimens subjected to our proposed mitigation strategies effectively withstand over 140 F-T cycles, substantially lowering crack damage risks.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.