Abstract
Within the scope of the High-Luminosity LHC project, the collaboration between CERN and U.S. LARP is developing new low- $\beta$ quadrupoles using the Nb3Sn superconducting technology for the upgrade of the LHC interaction regions. The magnet support structure of the first short model was designed, and two units were fabricated and tested at CERN and at LBNL. The structure provides the preload to the collar–coil subassembly by an arrangement of outer aluminum shells pretensioned with water-pressurized bladders. For the mechanical qualification of the structure and the assembly procedure, superconducting coils were replaced with solid aluminum “dummy coils,” and the structure was preloaded at room temperature and then cooled-down to 77 K. The mechanical behavior of the magnet structure was monitored with the use of strain gauges installed on the aluminum shells, the dummy coils, and the axial preload system. This paper reports on the outcome of the assembly and the cooldown tests with dummy coils, which were performed at CERN and at LBNL, and presents the strain gauge measurements compared with the 3-D finite-element model predictions.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.