Abstract

The main objective of adding piles to a raft is sometimes for settlement control. In design, the number of piles for reduce settlements under work load to a tolerable limit is usually small. This often results in a high stress in piles that may impede the application of this foundation due to the limits on raft stress or pile stress in practice. An alternative is to install a cushion between piles and raft. In this paper, the performance of disconnected settlement-reducing piles is studied. Based on some simplifications, a mechanical model of pile penetration into cushion and a calculation method of pile-soil interaction are respectively formulated. In consideration of stress-deformation coordination of pile-soil-cushion, a calculation method of pile-soil stress ratio is presented. Optimization design of disconnected settlement-reducing piles can be performed with this method.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.