Abstract

A recirculating terminal pumping system has been installed in the 3 MV Pelletron tandem accelerator in Lund. An extremly limited space in the high voltage terminal and the absence of electrical power in the terminal, forced us to provide a unique design for the installation and powering of the new pumps. Details of the technical design, as well as experience of the use of the new system for accelerator mass spectrometry, will be given.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.