Abstract

At present, the national norms of temporary support structure in building construction has not officially promulgated. there was no uniform standard in the structure design and construction, which leaded to the collapse of construction accidents occurring from time to time. Through measuring mechanical behavior of support system of coupler, the statics have obtained that loads of temporary support has been gradually imposed on the structure by step construction in the construction process. Construction loading is a complex process of construction mechanics. The measured axial force is larger than standard one by JGJ130-2001. The results shows the load structure suffered has been not fully taken into account. As the load of erecting pole of top and bottom is not the same, the height of structure bearing capacity has been considered in design. As the second-order effecting on structure, both horizontal rod and bridging bear a certain horizontal force in the construction process. The value of bridging stress is larger. In the structure design calculations, the arrangement of bridging should be paid more attention to improve the stability of the entire frame. The obtained results provides experiment basis for support system designed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.