Earned Value Management (EVM) measures project performance against a baseline plan. It identifies deviations in budget and schedule, aids project managers in taking earlier corrective actions against cost and schedule overruns. Although the literature highlights the significance of scope by adopting it as a leading indicator to measure project success or failure. However, EVM does not include scope when evaluating the performance of any software project. While considering the importance of scope and its ever-changing nature, it is imperative to measure the effect of changes in scope on the project plan. To analyse such effects, this study aims to enhance the traditional EVM by incorporating scope into it. The main objectives of this paper are: i) to extract the effects of project scope changes, ii) to map extracted effects of project scope changes with Software Project Scope Rating Index (SPSRI) elements, and iii) to quantify the extracted effects and integrate them with EVM. An extensive literature review is conducted to achieve the first objective, which results in the seventeen unique effects; that were used to map with SPSRI elements. To forecast the variations in scope for a given project budget, Monte Carlo simulations were run on the top eight scope elements, whereas, the results were incorporated with EVM to identify the deviations between actual and projected values of scope’s score and cost. Finally, the multivariate regression model was used to evaluate the influence of individual element on the overall estimated cost of the project. The correlation between the independent variables (SPSRI elements) and the dependent variable (overall cost) was calculated along with the valuation of each independent variable on the dependent variable. Moreover, the effects are statistically shown that independent variables have influenced the dependent variable. This technique could assist the project managers to forecast deviations in project scope earlier.

Highlights

  • Earned Value Management (EVM) is a widely used technique for monitoring and controlling project performance [1], [2]

  • We have presented the study with statistical proofs that the said elements have a drastic effect on increasing the overall cost of the project

  • To answer the RQ1 we have reviewed the existing work based on technique and tools for scope definition and how traditional EVM is used to measure the project performance with triple constraints of project measurement

Read more

Summary

Introduction

Earned Value Management (EVM) is a widely used technique for monitoring and controlling project performance [1], [2]. It has been used in different disciplines and projects to aid project planning, decision-making and project tracking [3]. Earned Value Management (EVM) which is considered the most commonly used technique to measure the progress of the project into different engineering disciplines like; electrical, electronic, civil, and IT etc. This technique uses different indices, variances and forecasting mechanisms discussed in Subsection II-A. These key parameters are described as follows [21], [22]

Objectives
Methods
Findings
Discussion
Conclusion
Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call