Abstract
IN CONNECTION with a study of a-c resistance and reactance of large conductors in steel pipe and conduit, made for the Insulated Power Cable Engineers Association, measurements were made of isolated conductors in air, 3-cabled conductors in air, and finally the 3-cabled conductors in various sizes of conduit. Each of these stages raised measurements problems, especially when it became desirable to determine the component losses due to each of the several factors operating. It likewise became necessary to establish the accuracy with which measurements could be made.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.