Abstract

Under the Large Tonnage Pre-Stress, the stress of concrete which is under the anchor plate is complicated. To ensure the safety of construction and structure, the condition of local stress of the bridge structure should be investigated. When the pre-stress steel of Segment 1# of Pier 1# of Hongwuwo Bridge is tensioned, the strain situation of concrete near the anchor plate of the box girder is measured. The measured value is compared with the analytical value which is obtained through space finite element method.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.