Abstract

The organizational and technological solutions for high-rise buildings construction efficiency increase are considered, primarily – decrease of typical floor construction time and improvement of bearing structures concrete quality. The essence of offered technology is: a concrete mixing station and a polygon mainly for load-bearing wall panels with starter bars casting are located on the building site; for reinforced concrete components manufacturing and butt joints grouting the warmed-up concrete mixtures are used. The results of researches and elaborations carried out by the SPSUACE in area of a preliminary warming-up of concrete mixtures are presented. The possibility and feasibility of their usage in high-rise buildings and of excess height buildings construction including cast-in-place and precast execution are shown. The essence of heat-vibro treating of concrete mixture is revealed as a kind of prior electroresistive curing, and the achieved results are: accelerated concrete strength gain, power inputs decrease, concrete quality improvement. It is shown that the location of a concrete mixing station on the building site enables to broaden possibilities of the “thermos” method use and to avoid concrete mixtures warming up in medium-mass structures erection (columns, girders) during the high-rise buildings construction. It is experimentally proved that the splice between precast elements encased with warmed-up concrete mixture is equal with conjugated elements in strength.

Highlights

  • The most important constructional and technological peculiarity of buildings of excess height (25-30 storeys) and high-rise buildings (100-150 and more storeys) is its significant height excess on dimensions in plan. From this it follows that the construction time of its substructure massively depends on typical floor construction time. 5-6 working days per storey is considered to be acceptable result according to literature [1, 2]

  • Because of limited sizes in plan decrease of typical floor construction time by means of compacting time schedules of different work types complete with traditional technologies is of little promise

  • The most typical floor construction decrease time effect may be got due to realization of organizational and technological conclusions being the point at issue of this article which are: location of a concrete mixing station and casting yard on the building site; the warmed-up concrete mixtures usage for reinforced concrete components on site casting and butt joints grouting; concrete mixture preparation with 350С - 450С temperature at the polygon for medium mass structures concrete pouring and their subsequent maturing by using the “thermos” method

Read more

Summary

Introduction

The most important constructional and technological peculiarity of buildings of excess height (25-30 storeys) and high-rise buildings (100-150 and more storeys) is its significant height excess on dimensions in plan. From this it follows that the construction time of its substructure massively depends on typical floor construction time. 5-6 working days per storey is considered to be acceptable result according to literature [1, 2]. The most typical floor construction decrease time effect may be got due to realization of organizational and technological conclusions being the point at issue of this article which are: location of a concrete mixing station and casting yard (mainly for wall panels manufacturing) on the building site; the warmed-up concrete mixtures usage for reinforced concrete components on site casting and butt joints grouting; concrete mixture preparation with 350С - 450С temperature at the polygon for medium mass structures concrete pouring and their subsequent maturing by using the “thermos” method

Methods
Results
Conclusion