Abstract
Abstract In this paper the methodology of measurement and construction of the test slab of the Laboratory of Reinforced Concrete Structures of the University of Thessaloniki is described. A total of 180 steel pipes of anchorage were placed in the test slab forming an 1.0 m × 1.0 m grid. The accurate positioning of the pipes was possible with the help of high precision geodetic measurements. Free network adjustment was used for an evaluation of the accuracy obtained. Accuracies of ± 1.0mm in plan and plusmn; 0.4mm in elevation were achieved in the positioning of the pipes.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.