The very rapid development of the manufacturing industry requires companies to be able to increase their productivity. Based on the analysis on the production machine, it is calculated that the Overall Equipment Effectiveness value is only 81%, this figure is still lower than the world class standard. What Affects Low OEE Value Is Performance and Machine Setup and Machine Downtime. This Repair Is Done Using Implementation Design of the Single Minute Exchange of Dies Method by Separating Internal and External Setups, Changing Internal Setup to External. After Getting Improved Internal and External Settings, The Time Reduction Value Is 30%, So It Can Improve Production Performance in The Manufacturing Industry.