Abstract
The proton engineering frontier project (PEFP) is developing a 20-mA, 100-MeV proton linac and 10 beam lines for 20 MeV and 100 MeV proton beams. The strip line type was selected for the proton linac and beam line BPM (Beam position monitor). That will be installed five beam-line BPMs and nine linac BPMs. After fabrication of to the BPMs, those were checked their electrical performance in the RF test and Beam test. This paper was summarized results of the pickup sensitivity and Log-ratio BPM electronics calibration.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.