Abstract

Achieving "Responsible Consumption and Production" is one of the 17 sustainable development goals set by the United Nations. Controlling overcapacity is an important guarantee in order to achieve this goal. There are many types and large quantities of raw materials in the construction industry, which easily leads to overcapacity. Studying the problems related to overcapacity in the construction industry helps to understand the formation mechanism of overcapacity in related industries. This puts forward targeted countermeasures and suggestions for the capacity resolution to achieve green and sustainable development. Based on this, this paper uses the construction industry capacity utilization data of the Shandong Province in China from 2005 to 2017. It also uses the production function method to construct a construction industry overcapacity calculation model to estimate the construction industry capacity utilization and overcapacity rate in Shandong Province. The DEA method was used to construct an extraction model of influencing factors for overcapacity. The results show that the capacity utilization ratio for Shandong Province from 2005 to 2016 was 81.98%. There was no overcapacity as a whole, but there were large fluctuations in capacity utilization for some time periods. Suggestions for optimization countermeasures were also proposed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.