Abstract
RBJ method is suitable for shallow covering and micro-disturbed underpassing project. In this paper, the pipe deformation induced by box culvert jacking is analyzed. The research shows that: (1) The closed pipe-roof frame presented a phenomenon of expanding outward, namely the uplift of top pipe and the settlement of bottom pipe. (2) Along the jacking direction, the deformation of pipes was positioned over the box culvert structure and about 10m in front of the excavation face. (3) Due to the bounded constraint of diagram wall, it’s prone to be a reverse deformation at joint between pipe and diagram wall, and resulting in a wave-type deformation pattern.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Earth and Environmental Science
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.