Abstract
For the first time in Bangladesh, a bench scale membrane bioreactor (MBR) unit was tested in treating a textile wastewater in the industry premises of EOS Textile Mills LTD, Dhaka for three months. The performance of the unit was compared with that of the conventional activated sludge treatment plant, which is in operation in the same premises. The COD and BOD removal efficiency of the MBR unit reached to around 90% and 80% respectively in 20 days whereas the removal efficiency of the conventional treatment plant was as low as 40-50% and 38-40% respectively. The outlet COD and the BOD level for the MBR unit remained stable in spite of the fluctuation in the feed value, while the conventional effluent treatment plant (ETP) failed to keep any stabilized level. The performance of the MBR unit was much superior to that of the functional ETP and the water treated by the MBR system can meet disposal standard.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.