Abstract

Poor hazard management is among significant difficulties confronting the construction business on issues of timely project completion. Although hazard factors are various, the nature of construction projects being inclined to changes amid execution makes it hard to satisfactorily catch chance perspectives identified with scheduling and timely project completion. Conventional 2D PC based devices don't enough use digitized calculable data, along these lines constrained in capturing construction risk. Hence, derive the benefit of prominent BIM to pass over this gap is presently being noted in growth venture management. This examination researches the utilization of BIM in managing scheduling risk of construction projects. In our study, to properly minimize the risk of schedule delay in projects; construction sequencing exercises should be satisfactorily digitized and BIM offers the total chance to integrate vital aspects of project management that management enhance scheduling risk management.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call