Abstract

In this paper, we address a simultaneous optimization problem of integrated production and energy system in an iron and steel plant. We develop a novel multi-period mixed integer linear optimization model incorporating many realistic operational features such as industrial boilers, steam turbines, combined heat and power generation units and waste heat recovery and power generation units. A case study of a real iron and steel plant demonstrates that compared to the realistic operational strategy, the total operational cost is reduced by 6.25 % using the proposed model.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.